Search

Hard Landscaping Complete

The last bit of plastering has been applied on Flaxengate.

The embankments and slopes near the town end of the layout have now been finished, this being the last of the hardlandscaping for the layout.


The completed landscape.

The layout is at the stage when it is time to move on and start adding the scenic details such as; paint, scatter, ballast and static grass. Most of these I have never done or have little experience doing.

The layout has been in it's current state for so long and I have become attached to it. It feels quite strange and I'm actually scared of getting started incase I make a mistake or things don't turn out right.

I think the next step is to start painting the plaster, so hopefully I shall pluck up the courage to start doing that soon.

15 June 2008 11:51 am